The project aimed to expand and modernize the transmission network, which was a precondition to reduce system losses, improve energy efficiency, and facilitate power trade with neighboring countries covered by the Central Asia Regional Economic Cooperation (CAREC) program. It also aimed to improve Barki Tojik’s operational performance, paving the way for the much-needed sector reforms.
This report validates the completion report's assessment of the project. IED overall assessment: Less than successful.